Bangladesh ReGas Projects
Challenge Improve Deliver
Bangladesh ReGas Projects
The Moheshkhali LNG re-gasification project, and the Summit Energy project that followed closely behind it, illustrates the strength of the Flintstone relationship in taking full project responsibility.
Forming a consortium of system designer, product supplier and installation contractor who together designed and installed the mooring, PLEM and pipeline system terminating at the beach head.
Located offshore Bangladesh in 35m of water with high currents and challenging seabed conditions the project required innovative solutions to a range of complex problems.
We had the financial strength, technical know-how, creativity and commercial creativity to take full responsibility for your project.
The client was able to let us take full responsibility for project execution.