Left panel text
The Moheshkhali LNG re-gasification project, and the Summit Energy project that followed closely behind it, illustrates the strength of the Flintstone relationship in taking full project responsibility.
Operating with an ROV insertable load pin the system allows the mooring system to be pre laid and each mooring line to be quickly hooked up in less than 2 hours saving a huge amount of time and eliminating the need for complex rigging.
In early 2016 the FPSO Kwame Nkrumah operating in Tullow’s Jubilee field offshore Ghana suffered a failure of the turret bearing causing the vessel to be unable to weather vane. This event then created a situation where…
Single Axis Chain Stoppers provide a simple way of connecting a mooring line to a turret table. In 2015 we were asked to design, manufacture and deliver a set of Chain Stoppers based on an existing design to suit the needs of our client.